Davis-Bacon wages in an electrical estimate: what to check before you bid
Davis-Bacon wages go into an electrical estimate the same way any labor rate does, but the rate comes from the government, not from your payroll. On covered federal construction work over $2,000, the Department of Labor says laborers and mechanics must be paid no less than the locally prevailing wages and fringe benefits, which the contract’s wage determination lists. Registered apprentices have their own rules, so check those with a professional. This guide shows where to find that determination, what to check in it, and how to carry it into your labor line.
What is Davis-Bacon, and when does it apply?
The Department of Labor (DOL) says the Davis-Bacon and Related Acts apply to contractors and subcontractors on federally funded or assisted contracts “in excess of $2,000” for the construction, alteration or repair of public buildings or public works. Covered contractors must pay laborers and mechanics “no less than the locally prevailing wages and fringe benefits for corresponding work on similar projects in the area.”
The DOL page says the Acts apply to subcontractors too, so a 20-person electrical shop can be covered without ever bidding to a federal agency. The bid documents should say so. Look for a wage determination attached to the specifications or a clause that cites Davis-Bacon.
What is a wage determination?
SAM.gov, the federal contracting site, defines a wage determination as “a set of wages, fringe benefits, and work rules” that DOL has found prevailing for a labor category in a locality. DOL’s page says SAM.gov is where contracting officers get wage determinations for their contracts.
For an estimator, the determination answers four questions:
- Which job classifications are listed for electrical work, and which are not?
- What is the hourly base wage for each?
- What is the hourly fringe benefit amount?
- Are there work rules attached to the rate?
Print or save the exact determination listed in your bid documents. It carries a number and a date, and you need both on file.
Which version of the wage rates applies?
The Federal Acquisition Regulation (FAR) explains how long a determination lasts. Under FAR 22.404-1:
- A general wage determination “remain[s] valid until modified, superseded, or canceled” by DOL.
- A project wage determination, used only when no general one applies, is “effective for 180 calendar days from the date of the determination.”
- Once a determination is in the contract, it “normally remains effective for the life of the contract,” unless the contracting officer exercises an option to extend the contract term.
FAR 22.404-5 covers project determinations that may expire before award. In a sealed bid, if the determination may expire, the contracting officer must request a new one early enough to receive it before bid opening. The bid opening can be postponed, the solicitation amended, and bidders allowed to change their bids. Rules for changes after bid opening are more detailed, so read the solicitation and ask the contracting officer.
The practical lesson is to price from the determination in the solicitation, check addenda for a replacement, and ask the contracting officer if you see a date that looks stale. Rules on other types of public work can differ, so read your own bid documents.
How do you price prevailing wages into a bid?
Treat the determination as the starting point of the labor rate, not the whole rate. A simple approach:
- Take the listed base wage and fringe amount for each classification you will use. Fringes are part of the required pay, so do not drop them.
- Add your own burden. Payroll taxes, workers’ compensation and other costs depend on the wage, and they come on top. Our guide to the labor burden rate shows how to build a loaded rate.
- Check your labor units against the crew mix. If the job requires more journeymen than your usual mix, your average rate moves. See labor units explained.
- Price overtime where the schedule needs it. DOL says the Contract Work Hours and Safety Standards Act requires overtime at one and one-half times the regular rate for hours over 40 in a workweek on prime contracts over $100,000. How it applies to you depends on the contract, so confirm with your advisers.
- Apply overhead and markup last, as with any bid. Our guide to markup, overhead and margin covers the traps.
An illustrative example, with made-up numbers: if a determination lists a $40.00 base wage and a $15.00 fringe amount for a classification, the required hourly package is $55.00 before your burden. Your own rate sheet may be higher or lower, so compare the two before you bid.
What if a worker’s classification is not listed?
Sometimes a task or title is not on the determination. The FAR has a process called conformance. Under FAR 22.406-3, the contractor submits a proposed classification and rate, “including any fringe benefits payments,” and the contracting officer checks whether it “bears a reasonable relationship to the wage rates in the wage determination in the contract.” Approval goes through DOL’s Wage and Hour Division.
This takes time, and you cannot assume the answer. If your plan depends on a classification that is not listed, flag it before bid day and ask the contracting officer or prime how they want it handled.
What mistakes cost bidders money?
- Using your normal rate sheet when the determination is higher.
- Leaving out fringes or double counting them with your own benefit costs.
- Pricing the wrong determination, such as one from an earlier solicitation.
- Ignoring the schedule, so overtime hours are not in the number.
- Missing the clause in a subcontract, because the requirement came down from the prime.