Temporary power in an electrical estimate: what to price or exclude

Temporary power is easy to lose money on because nobody draws it. Before you bid, decide what you will supply, what the general contractor supplies, and what you exclude, then write that down in your proposal. Rules from OSHA and the NEC set a floor for how the system must be built, so price to that floor and not to a guess.

What counts as temporary power on a bid?

It is the power and light the crew and other trades use before the permanent system is live. Typical pieces include a temporary service or generator connection, feeders, distribution panels, branch circuits, receptacles with ground-fault protection, and temporary lighting.

The scope varies by job. Some contracts make the electrical contractor responsible for all of it. Others give it to the general contractor, or say the electrical contractor only furnishes the lighting. The plans and specifications may be silent, so read Division 01 (general requirements) as well as Division 26, and ask in writing if it is unclear.

Which rules set the minimum build?

Two sets of rules matter most when you price.

OSHA on ground-fault protection. Under OSHA 29 CFR 1926.404(b)(1), employers must use either ground-fault circuit interrupters (GFCIs) or an assured equipment grounding conductor program. The GFCI option covers 120-volt, single-phase, 15- and 20-ampere receptacle outlets that are not part of the permanent wiring and are in use by employees. The assured grounding option has its own labor. OSHA lists a written description at the jobsite, a competent person, daily visual checks, and recorded tests before first use and at least every 3 months (6 months for fixed cord sets and receptacles not exposed to damage).

OSHA on lighting. OSHA 29 CFR 1926.56 lists minimum illumination in Table D-3. General construction area lighting needs 5 foot-candles, and so do indoor warehouses, corridors, hallways and exitways. First aid stations, infirmaries and offices need 30 foot-candles.

The NEC. Article 590 covers temporary installations. An EC&M explainer on Article 590 (May 2024, written to the 2017 NEC) notes these points:

  • Branch circuits must originate in approved switchgear or a panelboard.
  • All receptacles must be the grounding type, and branch circuits must include a separate equipment grounding conductor.
  • Receptacles on construction sites may not share a branch circuit with temporary lighting.
  • Temporary wiring must be removed immediately when construction or its purpose is complete.

Your jurisdiction may use a different NEC edition than the one in that article, so confirm what your local authority has adopted before you rely on a section number.

What labor and material should you list?

Build it as its own section of the estimate, not as a percentage added at the end. A starting list:

Item Questions to answer before you price it
Source Utility temporary service, generator, or tap from a permanent panel? Who pays the utility?
Feeders and panels How many, how far, and where do they move as the job progresses?
Receptacles and GFCI How many GFCI devices or portable GFCI units, and who tests and records them?
Temporary lighting What fixtures, how many, and which floors? Are they reused?
Moves and changes How many times will you relocate it as walls, floors and trades change?
Removal Who takes it down at the end, and when?
Permits and inspection Does the authority require a separate permit or inspection?

A flat percentage of the electrical price is tempting, but a short job with large floor plates can need far more temporary lighting than a long job in a small building. Counting the pieces gives you a number you can defend.

How do you handle moves, maintenance and removal?

These are the costs that do not show up on a drawing. A temporary system is built early, then changed as drywall goes up, ceilings close and other trades arrive. Each move takes crew time. Decide how many moves you are carrying and say so.

Also decide who maintains it. If the whole site relies on your temporary panels, bulbs and cords get damaged by other trades, and someone has to fix them. If the assured grounding program is your choice for cords and receptacles, the inspections and test records are recurring labor, so count the weeks you expect to be on site.

What should the proposal say?

Put the decision in plain words in your proposal letter. Illustrative wording choices (adapt them to your own job):

  • Included: “Temporary lighting to the levels in 29 CFR 1926.56 for the electrical contractor’s work areas.”
  • Excluded: “Utility temporary service charges, generator fuel, and temporary power for other trades.”
  • Clarified: “Temporary power is based on one relocation per floor.”

Keep your estimate and your letter matched. If your price carries a temporary panel, do not write “temporary power excluded” in the letter. If the letter excludes it, take its cost out of the estimate. Our post on electrical bid exclusions and clarifications covers the wording in more detail, and on public bids check that the bid form allows qualifications at all.

How do you keep it from being forgotten?

Add a temporary power line to your bid review checklist, so someone asks the question on every job. Our electrical bid checklist is a good place to add it. A quick check at review time costs minutes. Finding the gap after the contract is signed can cost a lot more.