Electrical bid checklist: what to check before you submit

Many bid mistakes are not hard math. They are small things that nobody looked at in the last hour: an addendum that was never priced, a scope item nobody owns, a quote that expired last week. A short, fixed checklist run before every submission catches many of them. Here is one you can adapt to your shop.

1. Documents and deadline

  1. Addenda. Every addendum is listed on the bid form, and its changes are in the estimate, not only acknowledged. Look for changes to sheets, specs, alternates and the bid date.
  2. Bid form. Every blank is filled in: base bid, alternates, unit prices, addenda numbers, signature, license number and anything else the instructions ask for. A missing line can disqualify a bid.
  3. Bid security. If the documents require a bid bond or other security, it is issued in the right form and amount.
  4. Delivery. Confirm where the bid goes, how it must be delivered and the deadline including the time zone. If you submit through a portal, upload early. Portals fail at the worst moment.

2. Scope

  1. Scope split. Verify who furnishes and who installs the items that fall between trades: mechanical equipment connections, starters and drives, controls wiring, fire alarm devices, low voltage, owner-furnished items, concrete pads, trenching, cutting and patching, and firestopping. Compare with the checks in How to read electrical plans before you start an estimate.
  2. Alternates and unit prices. Each one is priced as the form asks, not as you would like to see it.
  3. Allowances. Carried at the amount the documents state, with your handling, labor, overhead and profit priced as the contract requires.
  4. Exclusions and clarifications. Written down, specific and consistent with the bid form. Some public owners reject bids that take exception to the documents, so ask how clarifications may be submitted.

3. Price

  1. Material quotes. Current, and covering the major items. Check the hold dates against the likely award date. See Protecting electrical bids from copper and material price swings.
  2. Sales tax and freight. Confirm the tax treatment of materials for the project location and owner type. Rules differ by state. Some owners are tax exempt, but in many states the exemption does not carry over to a contractor buying materials, so confirm before you leave tax out. Check that freight is in.
  3. Permits and fees. Permit, plan review and inspection fees, and any utility service charges. Confirm who pulls the permit and who pays.
  4. Bonding and insurance. Performance and payment bond premiums if required, and any project-specific insurance requirements.
  5. Labor rate and burden. The rate matches the crew you plan to use. Burden covers payroll taxes, workers compensation and benefits. On federal construction contracts over $2,000, and on many federally assisted projects, Davis-Bacon prevailing wages and fringes apply under the contract’s wage determination. The threshold is the prime contract amount, so a small subcontract is still covered. Some states have their own rules for public work. Union work follows the agreement.
  6. Schedule and overtime. Does the schedule require shift work, weekend work or overtime? Federal law requires time and a half for covered, non-exempt employees after 40 hours in a workweek, and union agreements and some state laws add their own rules.
  7. Mobilization. Lifts, trailers, storage, tools, parking, hoisting and anything the site requires before work starts.
  8. Temporary power and lighting. Who provides it, for whom, and for how long? Check Division 01 for requirements.
  9. Commissioning and closeout. Testing, as-built drawings, operation and maintenance manuals, warranty paperwork, training, controls programming, punch list time and any spare parts the specs require.
  10. Overhead, profit and contingency. Applied once, on the right base. See Electrical estimating markup, overhead and margin without the math traps.

4. Proposal and validity

  1. Quote validity. State how long your price holds and that pricing after that date is subject to review.
  2. Inclusions and exclusions. The proposal matches the estimate. Do not claim to include what you did not price.
  3. Terms. Payment terms, retainage, change order pricing and any escalation language you are proposing. Have an attorney review contract language you rely on.

5. Second-person review

The person who built the estimate is the worst person to check it. Ask someone else to spend 30 minutes on it, even if the deadline is close. Give them a list:

  1. Does the total on the bid form match the estimate summary?
  2. Spot-check the five biggest line items against the plans and the quotes.
  3. Compare the total to past jobs of a similar type, such as cost per square foot or per device. Use it as a sanity check, not as a pricing method.
  4. Read the proposal the way the owner would. Is anything missing, unclear or contradictory?
  5. Look for last-minute changes. A number changed in the final hour is the one most likely to be wrong.

The checklist in one place

  1. Addenda priced and acknowledged
  2. Bid form complete and signed
  3. Bid security issued
  4. Scope split verified
  5. Exclusions and clarifications written
  6. Material quotes current
  7. Tax, freight, permits, bonds and insurance in
  8. Labor rate, burden, schedule and overtime checked
  9. Mobilization, temporary power and closeout in
  10. Overhead, profit and contingency applied once
  11. Quote validity stated
  12. Second person has reviewed it
  13. Delivery method and deadline confirmed

Where Amptake fits

Amptake is being built to count symbols from the legend and fixture schedule and show every count on the drawing for your review, so more of the day before the deadline goes to this final review instead of counting. The checklist itself, and the judgment behind each line, stay with you. Join the waitlist for early access.